What rustic land in Aberin allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Can you build a house on rustic land?
Navarre allows a new house on rustic land only where the town plan provides for it, on at least 1 ha.
DFL 1/2017, art. 115. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 2003. The region's planning viewer ↗
The SIU does not map land classes here: the town plan is the source.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
No well or borehole is recorded in Aberin. That is not proof there is no water: ask local drillers.
Ground: 58% low permeability, local groundwater only; 31% porous aquifer, medium productivity; 12% porous aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- 1.8% of the municipality lies in the 100-year flood zone; 1.8% in the 500-year one.
- 1.8% of the municipality is preferential flow zone, where new building is generally banned.
- Radon zone I: new and restored homes need radon protection by law.
Living here
- 4G reaches 100% of homes; fibre 83%. Averages for the municipality.
- Rain: 516 mm a year (1971–2000), about 453 by 2041–2070.
- Summer highs: 26.8 °C, about 30.6 °C by 2041–2070.
- Frost days: 45 a year, about 24 by 2041–2070.