Rustic land in Spain, municipality by municipality › Navarra
Beriáin
Navarra · Navarre · 5.4 km²
What rustic land in Beriáin allows and holds, for the municipality as a whole. For a particular plot, open it in the map: how many findings it has is free, and its full report answers for that exact point.
Can you build a house on rustic land?
Navarre allows a new house on rustic land only where the town plan provides for it, on at least 1 ha.
DFL 1/2017, art. 115. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 2000. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records one well or borehole in Beriáin. Their depths and yields, for the wells nearest a plot, are in that plot's report.
Ground: 69% practically impermeable; 9.8% porous aquifer, medium productivity; 9.3% low permeability, local groundwater only; 8.8% porous aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- 4.4% of the municipality lies in the 100-year flood zone; 4.4% in the 500-year one.
- 3.9% of the municipality is preferential flow zone, where new building is generally banned.
- Whether radon protection and the earthquake standard apply here is in each plot's report.
Maps of Spain: Flood zones · Radon · Wildfires
Living here
- Mobile and fibre coverage: in each plot's report.
- Rain: 667 mm a year (1971–2000), about 576 by 2041–2070.
- Summer highs: 25.8 °C, about 29.5 °C by 2041–2070.
- Frost days: 50 a year, about 28 by 2041–2070.
Around it
Galar · Valle de Elorz / Elortzibar · Tiebas-Muruarte de Reta
Selling land in Beriáin? Add a water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 10 October 2026. Information, not a certificate: the town hall has the final word.