Rustic land in Spain, municipality by municipality › Cantabria
Castañeda
Cantabria · Cantabria · 19 km²
What rustic land in Castañeda allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Can you build a house on rustic land?
Cantabria allows a new house on rustic land only within 200 m of a village, on at least 1,500 m².
Ley 5/2022, art. 51. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 1987. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Catastro records 83 homes on rustic plots in Castañeda, 22 of them built before 1950, and 136 farm buildings. See them on the map →
Towns in Cantabria where you can build a house →
Maps of Spain: Old farmhouses
Is there water?
IGME records one well or borehole in Castañeda. Its depth: 250 m. One spring is recorded.
Ground: 73% low permeability, local groundwater only; 22% porous aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- One fire since 2016 reached the municipality: 4 ha, in 2022.
- 5.6% of the municipality lies in the 100-year flood zone; 6.2% in the 500-year one.
- 3.6% of the municipality is preferential flow zone, where new building is generally banned.
- 2.6% of the municipality is Natura 2000: new works need the region's consent.
- Not a radon zone.
Maps of Spain: Flood zones · Radon · Wildfires
Living here
- 4G reaches 100% of homes; fibre 94%. Averages for the municipality.
- Rain: 1,233 mm a year (1971–2000), about 1,037 by 2041–2070.
- Summer highs: 23.4 °C, about 25.5 °C by 2041–2070.
- Frost days: 8 a year, about 2 by 2041–2070.
Around it
Santa María de Cayón · Puente Viesgo · Villaescusa · Santiurde de Toranzo · Piélagos
Selling land in Castañeda? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.