Rustic land in Spain, municipality by municipality › Navarra
Oroz-Betelu / Orotz-Betelu
Navarra · Navarre · 24 km²
What rustic land in Oroz-Betelu / Orotz-Betelu allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Oroz-Betelu / Orotz-Betelu →
Can you build a house on rustic land?
Navarre allows a new house on rustic land only where the town plan provides for it, on at least 1 ha.
DFL 1/2017, art. 115. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 2004. The region's planning viewer ↗
The SIU does not map land classes here: the town plan is the source.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
No well or borehole is recorded in Oroz-Betelu / Orotz-Betelu. That is not proof there is no water: ask local drillers.
Ground: 51% karstic or fissured aquifer, medium productivity; 21% practically impermeable; 19% low permeability, local groundwater only; 8.2% karstic or fissured aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- 0.5% of the municipality lies in the 100-year flood zone; 0.5% in the 500-year one.
- 0.5% of the municipality is preferential flow zone, where new building is generally banned.
- 14% of the municipality is Natura 2000: new works need the region's consent.
- 1% of the municipality is a protected natural area, whose plan limits what can be done.
- Not a radon zone.
Living here
- 4G reaches 100% of homes; fibre 84%. Averages for the municipality.
- Rain: 1,368 mm a year (1971–2000), about 1,165 by 2041–2070.
- Summer highs: 22.1 °C, about 25.6 °C by 2041–2070.
- Frost days: 71 a year, about 45 by 2041–2070.
Around it
Check a plot in Oroz-Betelu / Orotz-Betelu →
Selling land in Oroz-Betelu / Orotz-Betelu? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.