Rustic land in Spain, municipality by municipality › Asturias
Amieva
Asturias · Asturias · 115 km²
What rustic land in Amieva allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Can you build a house on rustic land?
Asturias allows a new house on rustic land only where the town plan provides for it.
DL 1/2004, art. 124. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 2006. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
No well or borehole is recorded in Amieva. That is not proof there is no water: ask local drillers. 27 springs are recorded.
Ground: 35% karstic or fissured aquifer, medium productivity; 23% karstic or fissured aquifer, high productivity; 20% low permeability, local groundwater only; 20% practically impermeable.
Choosing where to drill takes a hydrogeologist.
What to watch for
- 67 fires since 2016 reached the municipality: 4,396 ha in all, the latest in 2026.
- 0.8% of the municipality lies in the 100-year flood zone; 0.8% in the 500-year one.
- 0.8% of the municipality is preferential flow zone, where new building is generally banned.
- 100% of the municipality is Natura 2000: new works need the region's consent.
- 34% of the municipality is a protected natural area, whose plan limits what can be done.
- Radon zone II: new and restored homes need radon protection by law.
Living here
- 4G reaches 96% of homes; fibre 21%. Averages for the municipality.
- Rain: 1,430 mm a year (1971–2000), about 1,224 by 2041–2070.
- Summer highs: 20.7 °C, about 23.3 °C by 2041–2070.
- Frost days: 77 a year, about 52 by 2041–2070.
Around it
Ponga · Cangas de Onís · Oseja de Sajambre · Parres · Posada de Valdeón
Selling land in Amieva? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.