Rustic land in Spain, municipality by municipality › Zaragoza
Añón de Moncayo
Zaragoza · Aragón · 64 km²
What rustic land in Añón de Moncayo allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Añón de Moncayo →
Can you build a house on rustic land?
Aragón requires at least 1 ha for a new house on rustic land.
DL 1/2014, art. 34.2. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 1985. The region's planning viewer ↗
The SIU does not map land classes here: the town plan is the source.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 6 wells and boreholes in Añón de Moncayo. Half of the 6 with a depth found water at 50–120 m. 6 springs are recorded.
Ground: 56% low permeability, local groundwater only; 16% karstic or fissured aquifer, high productivity; 14% porous aquifer, medium productivity; 9% karstic or fissured aquifer, medium productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- One fire since 2016 reached the municipality: 9,195 ha, in 2022.
- No mapped flood zone (only studied rivers are mapped).
- 63% of the municipality is Natura 2000: new works need the region's consent.
- 63% of the municipality is a protected natural area, whose plan limits what can be done.
- Radon zone I: new and restored homes need radon protection by law.
Living here
- 4G reaches 100% of homes; fibre 56%. Averages for the municipality.
- Rain: 418 mm a year (1971–2000), about 376 by 2041–2070.
- Summer highs: 26.1 °C, about 29.9 °C by 2041–2070.
- Frost days: 57 a year, about 35 by 2041–2070.
Around it
Litago · Alcalá de Moncayo · Purujosa · Beratón · Talamantes · Trasmoz · Ambel · Calcena
Check a plot in Añón de Moncayo →
Selling land in Añón de Moncayo? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.