Rustic land in Spain, municipality by municipality › Valladolid
Becilla de Valderaduey
Valladolid · Castilla y León · 38 km²
What rustic land in Becilla de Valderaduey allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Becilla de Valderaduey →
Can you build a house on rustic land?
Castilla y León allows a new house on rustic land only when a farm needs it. Otherwise it has to go in a village, or restore a building.
Ley 5/1999, art. 23.1.e. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 2010. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 2 wells and boreholes in Becilla de Valderaduey. Half of the 2 with a depth found water at 160–270 m.
Ground: 88% low permeability, local groundwater only; 9.9% porous aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- 7.6% of the municipality lies in the 100-year flood zone; 11% in the 500-year one.
- 1.2% of the municipality is preferential flow zone, where new building is generally banned.
- Radon zone I: new and restored homes need radon protection by law.
Living here
- 4G reaches 100% of homes; fibre 100%. Averages for the municipality.
- Rain: 345 mm a year (1971–2000), about 328 by 2041–2070.
- Summer highs: 27.7 °C, about 31.9 °C by 2041–2070.
- Frost days: 77 a year, about 54 by 2041–2070.
Around it
Castroponce · Villavicencio de los Caballeros · Urones de Castroponce · Villacid de Campos · Ceinos de Campos · Mayorga
Check a plot in Becilla de Valderaduey →
Selling land in Becilla de Valderaduey? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.