What rustic land in Bossòst allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Can you build a house on rustic land?
Catalonia allows no new houses on rustic land. Restoring an existing or listed building is the way.
DL 1/2010, art. 47. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 1982. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 99% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
No well or borehole is recorded in Bossòst. That is not proof there is no water: ask local drillers.
Ground: 83% practically impermeable; 15% porous aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- One fire since 2016 reached the municipality: 32 ha, in 2023.
- 1.3% of the municipality lies in the 100-year flood zone; 1.9% in the 500-year one.
- 1.3% of the municipality is preferential flow zone, where new building is generally banned.
- 59% of the municipality is Natura 2000: new works need the region's consent.
- 59% of the municipality is a protected natural area, whose plan limits what can be done.
- Radon zone I: new and restored homes need radon protection by law.
Living here
- 4G reaches 100% of homes; fibre 97%. Averages for the municipality.
- Rain: 969 mm a year (1971–2000), about 869 by 2041–2070.
- Summer highs: 21.4 °C, about 24.7 °C by 2041–2070.
- Frost days: 157 a year, about 119 by 2041–2070.
Around it
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.