Castejón
Navarra · Navarre · 18 km²
What rustic land in Castejón allows and holds, for the municipality as a whole. For a particular plot, open it in the map: how many findings it has is free, and its full report answers for that exact point.
Can you build a house on rustic land?
Navarre allows a new house on rustic land only where the town plan provides for it, on at least 1 ha.
DFL 1/2017, art. 115. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 1991. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 2 wells and boreholes in Castejón. One spring is recorded. Their depths and yields, for the wells nearest a plot, are in that plot's report.
Ground: 83% porous aquifer, medium productivity; 17% porous aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- 17% of the municipality lies in the 100-year flood zone; 18% in the 500-year one.
- 17% of the municipality is preferential flow zone, where new building is generally banned.
- 9.2% of the municipality is Natura 2000: a project that could significantly affect a site needs an assessment of its effects first (Ley 42/2007, art. 46.4).
- 1.7% of the municipality is a protected natural area, whose plan limits what can be done.
- Whether radon protection and the earthquake standard apply here is in each plot's report.
Maps of Spain: Flood zones · Radon · Wildfires
Living here
- Mobile and fibre coverage: in each plot's report.
- Rain: 285 mm a year (1971–2000), about 255 by 2041–2070.
- Summer highs: 28.7 °C, about 32.4 °C by 2041–2070.
- Frost days: 29 a year, about 13 by 2041–2070.