Rustic land in Spain, municipality by municipality › Girona
Cervià de Ter
Girona · Catalonia · 10 km²
What rustic land in Cervià de Ter allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Cervià de Ter →
Can you build a house on rustic land?
Catalonia allows no new houses on rustic land. Restoring an existing or listed building is the way.
DL 1/2010, art. 47. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 2012. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 18 wells and boreholes in Cervià de Ter. Half of the 17 with a depth found water at 7–13 m.
Ground: 88% porous aquifer, medium productivity; 12% porous aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- 37% of the municipality lies in the 100-year flood zone; 40% in the 500-year one.
- 27% of the municipality is preferential flow zone, where new building is generally banned.
- 0.6% of the municipality is Natura 2000: new works need the region's consent.
- 0.6% of the municipality is a protected natural area, whose plan limits what can be done.
- Radon zone I: new and restored homes need radon protection by law.
- Basic seismic acceleration 0.09 g: new buildings need seismic design.
Living here
- 4G reaches 100% of homes; fibre 97%. Averages for the municipality.
- Rain: 556 mm a year (1971–2000), about 465 by 2041–2070.
- Summer highs: 29.9 °C, about 33.3 °C by 2041–2070.
- Frost days: 14 a year, about 4 by 2041–2070.
Around it
Bordils · Viladasens · Sant Joan de Mollet · Sant Jordi Desvalls · Sant Julià de Ramis · Vilademuls
Check a plot in Cervià de Ter →
Selling land in Cervià de Ter? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.