Rustic land in Spain, municipality by municipality › Guadalajara
El Cardoso de la Sierra
Guadalajara · Castilla-La Mancha · 187 km²
What rustic land in El Cardoso de la Sierra allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in El Cardoso de la Sierra →
Can you build a house on rustic land?
Castilla-La Mancha requires at least 1.5 ha for a new house on rustic land.
Other cases: 3 ha on protected rustic land.
Orden 4/2020, art. 5. A town plan can be stricter.
No town plan: the region's general rules apply. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 0.6% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
No well or borehole is recorded in El Cardoso de la Sierra. That is not proof there is no water: ask local drillers.
Ground: 92% practically impermeable; 8.3% porous aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- 4 fires since 2016 reached the municipality: 2,741 ha in all, the latest in 2026.
- No mapped flood zone (only studied rivers are mapped).
- 98% of the municipality is Natura 2000: new works need the region's consent.
- 99% of the municipality is a protected natural area, whose plan limits what can be done.
- Radon zone II: new and restored homes need radon protection by law.
Living here
- 4G reaches 99% of homes; fibre 81%. Averages for the municipality.
- Rain: 676 mm a year (1971–2000), about 625 by 2041–2070.
- Summer highs: 24.3 °C, about 28.4 °C by 2041–2070.
- Frost days: 108 a year, about 73 by 2041–2070.
Around it
La Hiruela · Montejo de la Sierra · Majaelrayo · Campillo de Ranas · Somosierra · Puebla de la Sierra · Cerezo de Arriba · Riofrío de Riaza
Check a plot in El Cardoso de la Sierra →
Selling land in El Cardoso de la Sierra? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.