Rustic land in Spain, municipality by municipality › Jaén
La Puerta de Segura
Jaén · Andalucía · 98 km²
What rustic land in La Puerta de Segura allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in La Puerta de Segura →
Can you build a house on rustic land?
Andalucía requires at least 2.5 ha for a new house on rustic land.
Other cases: 5 ha on forest land.
Decreto 550/2022, art. 31. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 1994. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 11 wells and boreholes in La Puerta de Segura. Half of the 11 with a depth found water at 70–110 m. 24 springs are recorded.
Ground: 69% practically impermeable; 21% karstic or fissured aquifer, high productivity; 5.6% porous aquifer, medium productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- One fire since 2016 reached the municipality: 12 ha, in 2020.
- No mapped flood zone (only studied rivers are mapped).
- 19% of the municipality is Natura 2000: new works need the region's consent.
- 0.7% of the municipality is a protected natural area, whose plan limits what can be done.
- Radon zone I: new and restored homes need radon protection by law.
Living here
- 4G reaches 100% of homes; fibre 86%. Averages for the municipality.
- Rain: 632 mm a year (1971–2000), about 548 by 2041–2070.
- Summer highs: 32 °C, about 36.1 °C by 2041–2070.
- Frost days: 31 a year, about 13 by 2041–2070.
Around it
Puente de Génave · Génave · Orcera · Benatae · Torres de Albánchez · Beas de Segura · Segura de la Sierra
Check a plot in La Puerta de Segura →
Selling land in La Puerta de Segura? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.