Rustic land in Spain, municipality by municipality › Toledo
Malpica de Tajo
Toledo · Castilla-La Mancha · 80 km²
What rustic land in Malpica de Tajo allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Malpica de Tajo →
Can you build a house on rustic land?
Castilla-La Mancha requires at least 1.5 ha for a new house on rustic land.
Other cases: 3 ha on protected rustic land.
Orden 4/2020, art. 5. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 2008. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 4 wells and boreholes in Malpica de Tajo. Half of the 4 with a depth found water at 46–50 m.
Ground: 75% low permeability, local groundwater only; 20% porous aquifer, high productivity; 5% porous aquifer, medium productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- 3 fires since 2016 reached the municipality: 90 ha in all, the latest in 2026.
- 1.7% of the municipality lies in the 100-year flood zone; 5.5% in the 500-year one.
- 1.7% of the municipality is preferential flow zone, where new building is generally banned.
- 1.1% of the municipality is Natura 2000: new works need the region's consent.
- Radon zone I: new and restored homes need radon protection by law.
Living here
- 4G reaches 100% of homes; fibre 97%. Averages for the municipality.
- Rain: 343 mm a year (1971–2000), about 323 by 2041–2070.
- Summer highs: 32.6 °C, about 36.7 °C by 2041–2070.
- Frost days: 37 a year, about 19 by 2041–2070.
Around it
Cebolla · Mesegar de Tajo · El Carpio de Tajo · San Martín de Pusa · La Pueblanueva · Villarejo de Montalbán
Check a plot in Malpica de Tajo →
Selling land in Malpica de Tajo? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.