Rustic land in Spain, municipality by municipality › Burgos
Miranda de Ebro
Burgos · Castilla y León · 101 km²
What rustic land in Miranda de Ebro allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Miranda de Ebro →
Can you build a house on rustic land?
Castilla y León allows a new house on rustic land only when a farm needs it. Otherwise it has to go in a village, or restore a building.
Ley 5/1999, art. 23.1.e. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 2005. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
No well or borehole is recorded in Miranda de Ebro. That is not proof there is no water: ask local drillers. 3 springs are recorded.
Ground: 42% low permeability, local groundwater only; 27% porous aquifer, high productivity; 21% karstic or fissured aquifer, medium productivity; 8.1% porous aquifer, medium productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- 8.1% of the municipality lies in the 100-year flood zone; 8.1% in the 500-year one.
- 6.5% of the municipality is preferential flow zone, where new building is generally banned.
- 45% of the municipality is Natura 2000: new works need the region's consent.
- Not a radon zone.
Living here
- 4G reaches 100% of homes; fibre 98%. Averages for the municipality.
- Rain: 488 mm a year (1971–2000), about 429 by 2041–2070.
- Summer highs: 26.3 °C, about 29.8 °C by 2041–2070.
- Frost days: 48 a year, about 27 by 2041–2070.
Around it
Bugedo · Cellorigo · Galbárruli · Ribera Baja / Erriberabeitia · Santa Gadea del Cid · Lantarón · Armiñón · Fonzaleche
Check a plot in Miranda de Ebro →
Selling land in Miranda de Ebro? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.