Rustic land in Spain, municipality by municipality › Guadalajara
Molina de Aragón
Guadalajara · Castilla-La Mancha · 168 km²
What rustic land in Molina de Aragón allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Molina de Aragón →
Can you build a house on rustic land?
Castilla-La Mancha requires at least 1.5 ha for a new house on rustic land.
Other cases: 3 ha on protected rustic land.
Orden 4/2020, art. 5. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 1996. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
No well or borehole is recorded in Molina de Aragón. That is not proof there is no water: ask local drillers. 5 springs are recorded.
Ground: 34% low permeability, local groundwater only; 27% porous aquifer, medium productivity; 18% karstic or fissured aquifer, high productivity; 11% karstic or fissured aquifer, medium productivity; 6.7% porous aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- 0.6% of the municipality lies in the 100-year flood zone; 0.6% in the 500-year one.
- 6.1% of the municipality is Natura 2000: new works need the region's consent.
- 6.1% of the municipality is a protected natural area, whose plan limits what can be done.
- Not a radon zone.
Living here
- 4G reaches 100% of homes; fibre 93%. Averages for the municipality.
- Rain: 387 mm a year (1971–2000), about 353 by 2041–2070.
- Summer highs: 27.6 °C, about 31.7 °C by 2041–2070.
- Frost days: 115 a year, about 84 by 2041–2070.
Around it
Castellar de la Muela · Rueda de la Sierra · Rillo de Gallo · Castilnuevo · Prados Redondos · Campillo de Dueñas · Tortuera · Embid
Check a plot in Molina de Aragón →
Selling land in Molina de Aragón? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.