Rustic land in Spain, municipality by municipality › León
Molinaseca
León · Castilla y León · 80 km²
What rustic land in Molinaseca allows and holds, for the municipality as a whole. For a particular plot, open it in the map: how many findings it has is free, and its full report answers for that exact point.
Can you build a house on rustic land?
Castilla y León allows a new house on rustic land only when a farm needs it. Otherwise it has to go in a village, or restore a building.
Ley 5/1999, art. 23.1.e. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 2023. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Catastro records 22 homes on rustic plots in Molinaseca, and 78 farm buildings. See them on the map (free with an account) →
Towns where a new house can be possible →
Maps of Spain: Old farmhouses
Is there water?
IGME records 4 wells and boreholes in Molinaseca. Their depths and yields, for the wells nearest a plot, are in that plot's report.
Ground: 85% practically impermeable; 14% low permeability, local groundwater only.
Choosing where to drill takes a hydrogeologist.
What to watch for
- 4 fires since 2016 reached the municipality: 950 ha in all, the latest in 2026.
- 0.6% of the municipality lies in the 500-year flood zone.
- Whether radon protection and the earthquake standard apply here is in each plot's report.
Maps of Spain: Flood zones · Radon · Wildfires
Living here
- Mobile and fibre coverage: in each plot's report.
- Rain: 697 mm a year (1971–2000), about 629 by 2041–2070.
- Summer highs: 23.9 °C, about 27.7 °C by 2041–2070.
- Frost days: 85 a year, about 59 by 2041–2070.
Around it
Castropodame · Ponferrada · Santa Colomba de Somoza · Congosto · Torre del Bierzo
Selling land in Molinaseca? Add a water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 10 October 2026. Information, not a certificate: the town hall has the final word.