Rustic land in Spain, municipality by municipality › Cuenca
Monteagudo de las Salinas
Cuenca · Castilla-La Mancha · 132 km²
What rustic land in Monteagudo de las Salinas allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Monteagudo de las Salinas →
Can you build a house on rustic land?
Castilla-La Mancha requires at least 1.5 ha for a new house on rustic land.
Other cases: 3 ha on protected rustic land.
Orden 4/2020, art. 5. A town plan can be stricter.
No town plan: the region's general rules apply. The region's planning viewer ↗
The SIU does not map land classes here: the town plan is the source.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 4 wells and boreholes in Monteagudo de las Salinas. Half of the 4 with a depth found water at 12–160 m. 11 springs are recorded.
Ground: 48% karstic or fissured aquifer, high productivity; 36% karstic or fissured aquifer, medium productivity; 14% porous aquifer, medium productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- One fire since 2016 reached the municipality: 96 ha, in 2019.
- No mapped flood zone (only studied rivers are mapped).
- 5.3% of the municipality is Natura 2000: new works need the region's consent.
- Radon zone I: new and restored homes need radon protection by law.
Living here
- 4G reaches 100% of homes; fibre 88%. Averages for the municipality.
- Rain: 430 mm a year (1971–2000), about 386 by 2041–2070.
- Summer highs: 29.8 °C, about 33.9 °C by 2041–2070.
- Frost days: 77 a year, about 49 by 2041–2070.
Around it
Solera de Gabaldón · Arguisuelas · Reíllo · Olmeda del Rey · Chumillas · Almodóvar del Pinar · Fuentes · Yémeda
Check a plot in Monteagudo de las Salinas →
Selling land in Monteagudo de las Salinas? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.