Can you build a house on rustic land?
Castilla-La Mancha requires at least 1.5 ha for a new house on rustic land.
Other cases: 3 ha on protected rustic land.
Orden 4/2020, art. 5. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 1992. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 98% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 25 wells and boreholes in Mota del Cuervo. Half of the 24 with a depth found water at 16–130 m. One spring is recorded.
Ground: 48% karstic or fissured aquifer, medium productivity; 32% porous aquifer, medium productivity; 12% porous aquifer, high productivity; 6.3% karstic or fissured aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- No mapped flood zone (only studied rivers are mapped).
- 5.2% of the municipality is Natura 2000: new works need the region's consent.
- 2.6% of the municipality is a protected natural area, whose plan limits what can be done.
- Radon zone I: new and restored homes need radon protection by law.
Living here
- 4G reaches 100% of homes; fibre 97%. Averages for the municipality.
- Rain: 321 mm a year (1971–2000), about 295 by 2041–2070.
- Summer highs: 32 °C, about 36.1 °C by 2041–2070.
- Frost days: 56 a year, about 33 by 2041–2070.
Around it
Santa María de los Llanos · Pedro Muñoz · El Toboso · Las Mesas · Los Hinojosos · Socuéllamos
Check a plot in Mota del Cuervo →
Selling land in Mota del Cuervo? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.