Rustic land in Spain, municipality by municipality › Zaragoza
Nombrevilla
Zaragoza · Aragón · 18 km²
What rustic land in Nombrevilla allows and holds, for the municipality as a whole. For a particular plot, open it in the map: how many findings it has is free, and its full report answers for that exact point.
Can you build a house on rustic land?
Aragón requires at least 1 ha for a new house on rustic land.
No new house where two or more homes stand within 150 m of it; one building per plot, at most 300 m² built, and the plot stays tied to it, undivided.
DL 1/2014, art. 34.2. A town plan can be stricter.
No town plan: the region's general rules apply. The region's planning viewer ↗
The SIU does not map land classes here: the town plan is the source.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Catastro records 9 homes on rustic plots in Nombrevilla, and 57 farm buildings. See them on the map (free with an account) →
Towns in Aragón where a new house can be possible →
Maps of Spain: Old farmhouses
Is there water?
No well or borehole is recorded in Nombrevilla. That is not proof there is no water: ask local drillers. 2 springs are recorded.
Ground: 69% low permeability, local groundwater only; 29% karstic or fissured aquifer, medium productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- No mapped flood zone (only studied rivers are mapped).
- Whether radon protection and the earthquake standard apply here is in each plot's report.
Maps of Spain: Flood zones · Radon · Wildfires
Living here
- Mobile and fibre coverage: in each plot's report.
- Rain: 352 mm a year (1971–2000), about 316 by 2041–2070.
- Summer highs: 27.4 °C, about 31.4 °C by 2041–2070.
- Frost days: 77 a year, about 51 by 2041–2070.
Around it
Villarroya del Campo · Anento · Villanueva de Jiloca · Romanos · Retascón · Daroca · Lechón · San Martín del Río
Selling land in Nombrevilla? Add a water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 10 October 2026. Information, not a certificate: the town hall has the final word.