Rustic land in Spain, municipality by municipality › Córdoba
Priego de Córdoba
Córdoba · Andalucía · 289 km²
What rustic land in Priego de Córdoba allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Priego de Córdoba →
Can you build a house on rustic land?
Andalucía requires at least 2.5 ha for a new house on rustic land.
Other cases: 5 ha on forest land.
Decreto 550/2022, art. 31. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 2016. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 34 wells and boreholes in Priego de Córdoba. Half of the 34 with a depth found water at 5–10 m. 54 springs are recorded.
Ground: 58% low permeability, local groundwater only; 29% karstic or fissured aquifer, high productivity; 5.6% porous aquifer, medium productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- No mapped flood zone (only studied rivers are mapped).
- 27% of the municipality is Natura 2000: new works need the region's consent.
- 27% of the municipality is a protected natural area, whose plan limits what can be done.
- Not a radon zone.
- Basic seismic acceleration 0.09 g: new buildings need seismic design.
Living here
- 4G reaches 100% of homes; fibre 88%. Averages for the municipality.
- Rain: 571 mm a year (1971–2000), about 495 by 2041–2070.
- Summer highs: 31.4 °C, about 35.2 °C by 2041–2070.
- Frost days: 10 a year, about 3 by 2041–2070.
Around it
Almedinilla · Fuente-Tójar · Carcabuey · Luque · Algarinejo · Montefrío · Alcaudete · Rute
Check a plot in Priego de Córdoba →
Selling land in Priego de Córdoba? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.