Rustic land in Spain, municipality by municipality › Burgos
Rebolledo de la Torre
Burgos · Castilla y León · 51 km²
What rustic land in Rebolledo de la Torre allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Rebolledo de la Torre →
Can you build a house on rustic land?
Castilla y León allows a new house on rustic land only when a farm needs it. Otherwise it has to go in a village, or restore a building.
Ley 5/1999, art. 23.1.e. A town plan can be stricter.
No town plan: the region's general rules apply. The region's planning viewer ↗
The SIU does not map land classes here: the town plan is the source.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
No well or borehole is recorded in Rebolledo de la Torre. That is not proof there is no water: ask local drillers.
Ground: 33% karstic or fissured aquifer, high productivity; 20% porous aquifer, medium productivity; 19% low permeability, local groundwater only; 11% karstic or fissured aquifer, medium productivity; 9.8% practically impermeable; 8.4% porous aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- One fire since 2016 reached the municipality: 8 ha, in 2024.
- No mapped flood zone (only studied rivers are mapped).
- 84% of the municipality is Natura 2000: new works need the region's consent.
- 1.4% of the municipality is a protected natural area, whose plan limits what can be done.
- Not a radon zone.
Living here
- 4G reaches 54% of homes; fibre 2.3%. Averages for the municipality.
- Rain: 567 mm a year (1971–2000), about 527 by 2041–2070.
- Summer highs: 24.1 °C, about 27.8 °C by 2041–2070.
- Frost days: 101 a year, about 73 by 2041–2070.
Around it
Alar del Rey · Valle de Valdelucio · Humada · Sotresgudo · Aguilar de Campoo
Check a plot in Rebolledo de la Torre →
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.