Rustic land in Spain, municipality by municipality › Badajoz
Valverde de Llerena
Badajoz · Extremadura · 41 km²
What rustic land in Valverde de Llerena allows and holds, for the municipality as a whole. For a particular plot, open it in the map: how many findings it has is free, and its full report answers for that exact point.
Check a plot in Valverde de Llerena →
Can you build a house on rustic land?
Extremadura requires at least 1.5 ha for a new house on rustic land.
Ley 11/2018, art. 70. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 1995. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Catastro records 0 homes on rustic plots in Valverde de Llerena, and 86 farm buildings. See them on the map (free with an account) →
Towns in Extremadura where a new house can be possible →
Maps of Spain: Old farmhouses
Is there water?
IGME records 4 wells and boreholes in Valverde de Llerena. Their depths and yields, for the wells nearest a plot, are in that plot's report.
Ground: 59% low permeability, local groundwater only; 36% practically impermeable; 5.4% karstic or fissured aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- No mapped flood zone (only studied rivers are mapped).
- Whether radon protection and the earthquake standard apply here is in each plot's report.
Maps of Spain: Flood zones · Radon · Wildfires
Living here
- Mobile and fibre coverage: in each plot's report.
- Rain: 481 mm a year (1971–2000), about 421 by 2041–2070.
- Summer highs: 32.4 °C, about 36.3 °C by 2041–2070.
- Frost days: 12 a year, about 4 by 2041–2070.
Around it
Berlanga · Guadalcanal · Azuaga · Reina
Check a plot in Valverde de Llerena →
Selling land in Valverde de Llerena? Add a water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 10 October 2026. Information, not a certificate: the town hall has the final word.