Rustic land in Spain, municipality by municipality › Zamora
Villar del Buey
Zamora · Castilla y León · 134 km²
What rustic land in Villar del Buey allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Villar del Buey →
Can you build a house on rustic land?
Castilla y León allows a new house on rustic land only when a farm needs it. Otherwise it has to go in a village, or restore a building.
Ley 5/1999, art. 23.1.e. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 2005. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 99% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
No well or borehole is recorded in Villar del Buey. That is not proof there is no water: ask local drillers.
Ground: 71% practically impermeable; 18% surface water body; 9% porous aquifer, medium productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- 3 fires since 2016 reached the municipality: 12,205 ha in all, the latest in 2026.
- No mapped flood zone (only studied rivers are mapped).
- 33% of the municipality is Natura 2000: new works need the region's consent.
- 33% of the municipality is a protected natural area, whose plan limits what can be done.
- Radon zone II: new and restored homes need radon protection by law.
Living here
- 4G reaches 100% of homes; fibre 86%. Averages for the municipality.
- Rain: 459 mm a year (1971–2000), about 431 by 2041–2070.
- Summer highs: 28.5 °C, about 32.7 °C by 2041–2070.
- Frost days: 60 a year, about 38 by 2041–2070.
Around it
Salce · Muga de Sayago · Roelos de Sayago · Fariza · Sardón de los Frailes · Fermoselle · Almendra · Bermillo de Sayago
Check a plot in Villar del Buey →
Selling land in Villar del Buey? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.