Rustic land in Spain, municipality by municipality › Málaga
Cuevas de San Marcos
Málaga · Andalucía · 37 km²
What rustic land in Cuevas de San Marcos allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Cuevas de San Marcos →
Can you build a house on rustic land?
Andalucía requires at least 2.5 ha for a new house on rustic land.
Other cases: 5 ha on forest land.
Decreto 550/2022, art. 31. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 2015. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 18 wells and boreholes in Cuevas de San Marcos. Half of the 18 with a depth found water at 8–45 m. 26 springs are recorded.
Ground: 61% low permeability, local groundwater only; 21% porous aquifer, medium productivity; 7.1% karstic or fissured aquifer, high productivity; 6.6% practically impermeable.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- 0.5% of the municipality lies in the 100-year flood zone; 0.5% in the 500-year one.
- 1% of the municipality is Natura 2000: new works need the region's consent.
- 3% of the municipality is a protected natural area, whose plan limits what can be done.
- Not a radon zone.
- Basic seismic acceleration 0.09 g: new buildings need seismic design.
Living here
- 4G reaches 100% of homes; fibre 93%. Averages for the municipality.
- Rain: 483 mm a year (1971–2000), about 419 by 2041–2070.
- Summer highs: 32.9 °C, about 36.5 °C by 2041–2070.
- Frost days: 7 a year, about 2 by 2041–2070.
Around it
Cuevas Bajas · Encinas Reales · Villanueva de Algaidas · Iznájar · Rute
Check a plot in Cuevas de San Marcos →
Selling land in Cuevas de San Marcos? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.