Rustic land in Spain, municipality by municipality › Tarragona
La Riera de Gaià
Tarragona · Catalonia · 8.8 km²
What rustic land in La Riera de Gaià allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in La Riera de Gaià →
Can you build a house on rustic land?
Catalonia allows no new houses on rustic land. Restoring an existing or listed building is the way.
DL 1/2010, art. 47. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 2009. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 39 wells and boreholes in La Riera de Gaià. Half of the 37 with a depth found water at 25–92 m.
Ground: 58% low permeability, local groundwater only; 23% porous aquifer, medium productivity; 18% porous aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- 6.5% of the municipality lies in the 100-year flood zone; 10% in the 500-year one.
- 1.5% of the municipality is preferential flow zone, where new building is generally banned.
- 4% of the municipality is Natura 2000: new works need the region's consent.
- 4% of the municipality is a protected natural area, whose plan limits what can be done.
- Not a radon zone.
Living here
- 4G reaches 100% of homes; fibre 94%. Averages for the municipality.
- Rain: 337 mm a year (1971–2000), about 287 by 2041–2070.
- Summer highs: 28.6 °C, about 31.5 °C by 2041–2070.
- Frost days: 3 a year, about 1 by 2041–2070.
Around it
Altafulla · La Nou de Gaià · El Catllar · Vespella de Gaià · Tarragona
Check a plot in La Riera de Gaià →
Selling land in La Riera de Gaià? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.