Rustic land in Spain, municipality by municipality › Valencia/València
Montroi / Montroy
Valencia/València · Valencian Community · 31 km²
What rustic land in Montroi / Montroy allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Montroi / Montroy →
Can you build a house on rustic land?
The Valencian Community requires at least 1 ha for a new house on rustic land.
DL 1/2021, art. 211. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 2007. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 24 wells and boreholes in Montroi / Montroy. Half of the 21 with a depth found water at 22–250 m. 7 springs are recorded.
Ground: 35% practically impermeable; 27% low permeability, local groundwater only; 15% porous aquifer, medium productivity; 9.3% karstic or fissured aquifer, high productivity; 7.5% porous aquifer, high productivity; 5.6% karstic or fissured aquifer, medium productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- 3.7% of the municipality lies in the 100-year flood zone; 5.6% in the 500-year one.
- 3.7% of the municipality is preferential flow zone, where new building is generally banned.
- 9.3% of the municipality is Natura 2000: new works need the region's consent.
- Not a radon zone.
Living here
- 4G reaches 97% of homes; fibre 52%. Averages for the municipality.
- Rain: 456 mm a year (1971–2000), about 392 by 2041–2070.
- Summer highs: 29.6 °C, about 32.9 °C by 2041–2070.
- Frost days: 5 a year, about 1 by 2041–2070.
Around it
Real · Turís · Montserrat · Llombai · Dos Aguas
Check a plot in Montroi / Montroy →
Selling land in Montroi / Montroy? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.