Rustic land in Spain, municipality by municipality › Salamanca
Navarredonda de la Rinconada
Salamanca · Castilla y León · 13 km²
What rustic land in Navarredonda de la Rinconada allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Navarredonda de la Rinconada →
Can you build a house on rustic land?
Castilla y León allows a new house on rustic land only when a farm needs it. Otherwise it has to go in a village, or restore a building.
Ley 5/1999, art. 23.1.e. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 2011. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
No well or borehole is recorded in Navarredonda de la Rinconada. That is not proof there is no water: ask local drillers.
Ground: 89% practically impermeable; 11% karstic or fissured aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- No mapped flood zone (only studied rivers are mapped).
- 33% of the municipality is Natura 2000: new works need the region's consent.
- Radon zone II: new and restored homes need radon protection by law.
Living here
- 4G reaches 100% of homes; fibre 91%. Averages for the municipality.
- Rain: 712 mm a year (1971–2000), about 666 by 2041–2070.
- Summer highs: 27.3 °C, about 31.3 °C by 2041–2070.
- Frost days: 67 a year, about 43 by 2041–2070.
Around it
La Rinconada de la Sierra · La Bastida · Escurial de la Sierra · Tejeda y Segoyuela · San Miguel de Valero
Check a plot in Navarredonda de la Rinconada →
Selling land in Navarredonda de la Rinconada? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.