Discover Land

Rustic land in Spain, municipality by municipality › Pontevedra

Sanxenxo

Pontevedra · Galicia · 44 km²

What rustic land in Sanxenxo allows and holds, for the municipality as a whole. For a particular plot, open it in the map: how many findings it has is free, and its full report answers for that exact point.

Check a plot in Sanxenxo →

Can you build a house on rustic land?

Galicia allows a new house on rustic land only when a farm needs it. Otherwise it has to go in a village, or restore a building.

Any building from before 2 May 1975, whatever its use, may become a home with the town licence alone and grow by up to half its volume.

Ley 2/2016, arts. 35, 39 y 40. A town plan can be stricter.

Plan in force: Plan General (a full town plan), from 2003. The region's planning viewer ↗

The national urban information system (SIU) maps the land class for 100% of the municipality.

Only the town hall can confirm it, in writing: ask for a certificado urbanístico.

Catastro records 3,714 homes on rustic plots in Sanxenxo, 534 of them built before 1950, and 499 farm buildings. See them on the map (free with an account) →

1,455 of its buildings on rustic land, of any use, stood before 1975: in Galicia each of them may become a home with the town licence alone (Ley 2/2016, art. 40).

Towns where a new house can be possible →

Maps of Spain: Old farmhouses

Is there water?

IGME records one well or borehole in Sanxenxo. One spring is recorded. Their depths and yields, for the wells nearest a plot, are in that plot's report.

Ground: 66% practically impermeable; 15% porous aquifer, high productivity; 13% porous aquifer, medium productivity.

Choosing where to drill takes a hydrogeologist.

Maps of Spain: Wells · Aquifers

What to watch for

Maps of Spain: Flood zones · Radon · Wildfires

Living here

Around it

Check a plot in Sanxenxo →

Selling land in Sanxenxo? Add a water and building check to your listing.

From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 10 October 2026. Information, not a certificate: the town hall has the final word.