Rustic land in Spain, municipality by municipality › León
Valencia de Don Juan
León · Castilla y León · 59 km²
What rustic land in Valencia de Don Juan allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Valencia de Don Juan →
Can you build a house on rustic land?
Castilla y León allows a new house on rustic land only when a farm needs it. Otherwise it has to go in a village, or restore a building.
Ley 5/1999, art. 23.1.e. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 2007. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 8 wells and boreholes in Valencia de Don Juan. Half of the 8 with a depth found water at 6–476 m.
Ground: 53% low permeability, local groundwater only; 30% porous aquifer, high productivity; 17% porous aquifer, medium productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- 21% of the municipality lies in the 100-year flood zone; 22% in the 500-year one.
- 18% of the municipality is preferential flow zone, where new building is generally banned.
- 1.3% of the municipality is Natura 2000: new works need the region's consent.
- Not a radon zone.
Living here
- 4G reaches 100% of homes; fibre 94%. Averages for the municipality.
- Rain: 356 mm a year (1971–2000), about 337 by 2041–2070.
- Summer highs: 27.4 °C, about 31.5 °C by 2041–2070.
- Frost days: 86 a year, about 62 by 2041–2070.
Around it
Villabraz · Pajares de los Oteros · Villademor de la Vega · Fresno de la Vega · San Millán de los Caballeros · Toral de los Guzmanes · Villaornate y Castro · Villamañán
Check a plot in Valencia de Don Juan →
Selling land in Valencia de Don Juan? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.