Rustic land in Spain, municipality by municipality › Burgos
Valle de Manzanedo
Burgos · Castilla y León · 70 km²
What rustic land in Valle de Manzanedo allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Valle de Manzanedo →
Can you build a house on rustic land?
Castilla y León allows a new house on rustic land only when a farm needs it. Otherwise it has to go in a village, or restore a building.
Ley 5/1999, art. 23.1.e. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 2015. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
No well or borehole is recorded in Valle de Manzanedo. That is not proof there is no water: ask local drillers.
Ground: 43% karstic or fissured aquifer, high productivity; 37% karstic or fissured aquifer, medium productivity; 17% practically impermeable.
Choosing where to drill takes a hydrogeologist.
What to watch for
- No mapped fire since 2016.
- No mapped flood zone (only studied rivers are mapped).
- 52% of the municipality is Natura 2000: new works need the region's consent.
- 52% of the municipality is a protected natural area, whose plan limits what can be done.
- Not a radon zone.
Living here
- 4G reaches 99% of homes; fibre 0.3%. Averages for the municipality.
- Rain: 743 mm a year (1971–2000), about 635 by 2041–2070.
- Summer highs: 24.3 °C, about 27.6 °C by 2041–2070.
- Frost days: 78 a year, about 53 by 2041–2070.
Around it
Valle de Zamanzas · Villarcayo de Merindad de Castilla la Vieja · Alfoz de Bricia · Merindad de Valdivielso · Valle de Valdebezana · Los Altos · Merindad de Valdeporres
Check a plot in Valle de Manzanedo →
Selling land in Valle de Manzanedo? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.