Rustic land in Spain, municipality by municipality › Alicante/Alacant
Xixona / Jijona
Alicante/Alacant · Valencian Community · 164 km²
What rustic land in Xixona / Jijona allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Check a plot in Xixona / Jijona →
Can you build a house on rustic land?
The Valencian Community requires at least 1 ha for a new house on rustic land.
DL 1/2021, art. 211. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 1986. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 37 wells and boreholes in Xixona / Jijona. Half of the 33 with a depth found water at 87–296 m. 22 springs are recorded.
Ground: 37% karstic or fissured aquifer, medium productivity; 28% porous aquifer, medium productivity; 16% low permeability, local groundwater only; 13% karstic or fissured aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- One fire since 2016 reached the municipality: 1 ha, in 2022.
- No mapped flood zone (only studied rivers are mapped).
- 19% of the municipality is Natura 2000: new works need the region's consent.
- 1.8% of the municipality is a protected natural area, whose plan limits what can be done.
- Not a radon zone.
- Basic seismic acceleration 0.09 g: new buildings need seismic design.
Living here
- 4G reaches 99% of homes; fibre 82%. Averages for the municipality.
- Rain: 320 mm a year (1971–2000), about 272 by 2041–2070.
- Summer highs: 27.9 °C, about 31.2 °C by 2041–2070.
- Frost days: 13 a year, about 4 by 2041–2070.
Around it
la Torre de les Maçanes / Torremanzanas · Busot · Ibi · Relleu · Tibi · Alcoi / Alcoy · Sant Vicent del Raspeig / San Vicente del Raspeig · Castalla
Check a plot in Xixona / Jijona →
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.