Can you build a house on rustic land?
Andalucía requires at least 2.5 ha for a new house on rustic land.
Other cases: 5 ha on forest land.
Decreto 550/2022, art. 31. A town plan can be stricter.
Plan in force: Normas Subsidiarias (an older, simpler plan), from 1994. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 10 wells and boreholes in Zalamea la Real. Half of the 8 with a depth found water at 43–66 m. 3 springs are recorded.
Ground: 67% low permeability, local groundwater only; 34% practically impermeable.
Choosing where to drill takes a hydrogeologist.
What to watch for
- 6 fires since 2016 reached the municipality: 60,898 ha in all, the latest in 2026.
- No mapped flood zone (only studied rivers are mapped).
- 19% of the municipality is Natura 2000: new works need the region's consent.
- 5.4% of the municipality is a protected natural area, whose plan limits what can be done.
- Radon zone I: new and restored homes need radon protection by law.
Living here
- 4G reaches 99% of homes; fibre 99%. Averages for the municipality.
- Rain: 727 mm a year (1971–2000), about 620 by 2041–2070.
- Summer highs: 33.1 °C, about 36.5 °C by 2041–2070.
- Frost days: 3 a year, about 1 by 2041–2070.
Around it
El Campillo · Valverde del Camino · Berrocal · La Zarza-Perrunal · Almonaster la Real · Paterna del Campo · Calañas
Check a plot in Zalamea la Real →
Selling land in Zalamea la Real? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.