Rustic land in Spain, municipality by municipality › Valencia/València
Xeresa
Valencia/València · Valencian Community · 17 km²
What rustic land in Xeresa allows and holds, for the municipality as a whole. For a particular plot, open it in the map: the report answers for that exact point.
Can you build a house on rustic land?
The Valencian Community requires at least 1 ha for a new house on rustic land.
DL 1/2021, art. 211. A town plan can be stricter.
Plan in force: Plan General (a full town plan), from 1999. The region's planning viewer ↗
The national urban information system (SIU) maps the land class for 100% of the municipality.
Only the town hall can confirm it, in writing: ask for a certificado urbanístico.
Is there water?
IGME records 21 wells and boreholes in Xeresa. Half of the 21 with a depth found water at 21–40 m. 5 springs are recorded.
Ground: 24% surface water body; 23% porous aquifer, medium productivity; 19% karstic or fissured aquifer, high productivity; 14% low permeability, local groundwater only; 11% karstic or fissured aquifer, medium productivity; 9% porous aquifer, high productivity.
Choosing where to drill takes a hydrogeologist.
What to watch for
- 2 fires since 2016 reached the municipality: 66 ha in all, the latest in 2023.
- 33% of the municipality lies in the 100-year flood zone; 35% in the 500-year one.
- 66% of the municipality is Natura 2000: new works need the region's consent.
- 24% of the municipality is a protected natural area, whose plan limits what can be done.
- Not a radon zone.
Living here
- 4G reaches 100% of homes; fibre 94%. Averages for the municipality.
- Rain: 578 mm a year (1971–2000), about 490 by 2041–2070.
- Summer highs: 28.4 °C, about 31.3 °C by 2041–2070.
- Frost days: 2 a year, about 0 by 2041–2070.
Around it
Gandia · Xeraco · Barx · Benifairó de la Valldigna · Simat de la Valldigna
Selling land in Xeresa? Add a free water and building check to your listing.
From IGME, MITECO, SNCZI, EFFIS, the SIU, the Building Code, NCSE-02, SETID and AdapteCCa; summarised 9 October 2026. Information, not a certificate: the town hall has the final word.